Yesterday was the big day when the house arrived and was set on it's foundation! It was an incredible process to watch, and definitely the coolest thing that I have ever seen. We awoke to an overcast, chilly morning, and headed over to the site around 7:30. The kids had stayed home from school for the day so that they could see all the action. We sat outside and waited to see the first sign that the house was on it's way.
The crew arrived with the crane around 8 am, and they got busy setting up it up and making sure it was properly supported. At about 8:30, we saw the first part of the house making it's way down the street. By this point we had been joined by my parents and most of our neighbors. It was the most exciting thing to happen in the neighborhood in a very long time, and nobody wanted to miss it. There were a few tense moments as the truck made it's way around the corner. It's a good thing we had talented drivers and that my parents (who live on the corner) didn't mind that the truck had to go up on their lawn a little bit! The house was in 4 pieces called modules, and there were 2 modules on each truck. The first trailer held the bottom & top of the back of the house. The crew got right to work removing packing material from the first module, and we got our first glimpse of the interior of the house. The very first thing I saw was the kitchen cabinets (which were already installed). It only took a few minutes from that point for them to get the house attached to the crane, and before we knew it, the first piece was in the air! Talk about holding your breath! There is nothing quite like watching a quarter of your house suspened way up in the air by just a few cables! As soon as the module was on the foundation the guys fastened it down and set the 4 lolly colums in the basement. The whole process of setting & fastening that first module only took about 30 minutes. Just as they were finishing that first piece, Matt's classmates showed up. His school is just around the corner, so we invited his whole class down to watch the process. Talk about a great learning opportunity! We had a whole lot of family, friends, and neighbors there as well. It gave the day a nice community feel, which I really enjoyed. The second module was raised, and soon joined the first - we had a half a house! One of my favorite parts of the day was when the second module rose into the air and all the kids oohed &aahed. That was quickly followed by laughter because the module had to be turned mid-air to be placed properly, giving the kids a great view of one of the upsairs bathrooms, complete with toilet! They just thought that was the funniest thing (after all, how many times have you seen a flying toilet?). We had a lull in the action for a while while the truck left to pick up the second trailer, which was stored about a mile away. When the trailer returned with the front half of the house, the crew started removing packing material and got the third module up in no time at all. The 4th and final piece took the longest to set since they had to work around the ones that were already in place, and that one seemed to have the most wires hanging down out of it, which they had to be careful of. Next came the roof. I hadn't really known how the roof came, if it would be in pieces or what. It turned out that the roof was actually attached already to the top modules, and it was laying flat, hinged along the line where it met the house. The crew used the crane to pull it up, and the guys jumped inside to set the support trusses in place. They then followed the process on the other side, leaving a gap of a few feet in the center of the roof. Once all the trusses were secured, they flipped up the top pieces, which had been hinged the same way the larger part of the roof was, to create the peak. The short sides of the roof (which were shaped like triangles) had actually been shipped nailed to the outsides of the modules. I had thought those parts were just something to protect the house during transport. I tell you, they have this whole thing down to a science, and they waste no space or materials. They raised up the short pieces with the crane, and attached them to the roof. And there is was, our new home! It was maybe 2pm at that point. I still cannot believe how quickly we went from a foundation to house...that's only 6 hours! Even before the crane packed up & drove off the house was a hive of activity. There were plumbers & electricians in the basement and in the house, and guys up on the roof finishing the shingles. By 4 pm we had a finished roof, and most of the plumbing & electrical done. Allen & I did get to go inside and walk around. What a feeling that was! Remember, we had never actually been inside a house like ours before, we had picked this style from plans, so had only seen it on paper. To have it go from paper to reality was pretty fantastic! A lot of imagination is still required at this point, but the house is about 80% done. The cabinets in the kitchen and upstairs bathrooms are installed, the tile and linoleum is down, bathroom fixtures are mostly in place, and shelving is up in the pantry closet; but there is still more to do. For instance, we have no counters in the kitchen, no vanity in the downstairs bathroom, and to get up the stairs, you have to crawl becasue the top of the staircase has not been fully cut-out yet (to give it stability during shipping) and there's maybe 2 ft of clearance. Much of the plumbing and electrical still need to be connected. The kids got to come in and see it once most of the crew was out, and they loved it. Matt especially thought crawling up the stairs was cool, and would like to keep it that way (not happening, too hard on the back!). They are so pleased with their rooms, in love with the amount of closet space, and excited about having a bathroom that they don't have to share with 3 other people (just each other).
A lot will be happening there today, and I will try to post some new pictures and details tonight.
 |
| The crane |
 |
| The first module |
 |
| The second module -bathroom on the right |
 |
| The second half coming down the street |
 |
| The third module in place |
 |
| Fourth and final in the air |

 |